0 C Analog & Digital IC Development Tools

Results: 197
Select Image Part # Mfr. Description Datasheet Availability Pricing (USD) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Texas Instruments Power Management IC Development Tools Eval Mod for BQ24617 Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1
Max.: 5

Texas Instruments Power Management IC Development Tools BQ24770EVM-540 Lead-Time 12 Weeks
Min.: 1
Mult.: 1
Max.: 5
Texas Instruments Power Management IC Development Tools SMBus 2-S to 4-S hyb rid power boost mod Lead-Time 12 Weeks
Min.: 1
Mult.: 1
Max.: 5

Texas Instruments Power Management IC Development Tools BQ25100 Eval Mod Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1
Max.: 5

Texas Instruments Power Management IC Development Tools BQ25700AEVM-732 Lead-Time 12 Weeks
Min.: 1
Mult.: 1
Max.: 5
Texas Instruments Power Management IC Development Tools BQ25713EVM-732 Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1
Max.: 5
Texas Instruments Switch IC Development Tools HD3SS6126 EVAL MOD Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1
Max.: 5

Texas Instruments Power Management IC Development Tools TPS543C20 1-PHASE EV ALUATION MODULE Lead-Time 12 Weeks
Min.: 1
Mult.: 1
Max.: 5
HMS Networks Interface Development Tools CAN-IB100/PCIe 2 CAN; isolated Non-Stocked Lead-Time 2 Weeks
Min.: 1
Mult.: 1

HMS Networks Interface Development Tools CAN-IB200/PCIe 1 CAN; isolated Non-Stocked Lead-Time 9 Weeks
Min.: 1
Mult.: 1

HMS Networks Interface Development Tools CAN-IB600/PCIe 1 CAN FD; isol. Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

Advantech Interface Development Tools 2-axis Stepping/Pules-type Servo Motor C Non-Stocked Lead-Time 3 Weeks
Min.: 1
Mult.: 1

Advantech Interface Development Tools RIO-3315-C1E with 4 LAN ports for MIC-3395 Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1

Texas Instruments Power Management IC Development Tools LM2675-5.0 EVAL BOAR D Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1
Max.: 5

XP Power Power Management IC Development Tools EVALUATION BOARD FOR CA-SERIES Non-Stocked Lead-Time 16 Weeks
A tariff of 10% may be applied if shipping to the United States.
Min.: 1
Mult.: 1


Silvertel Interface Development Tools Subscriber Line Interface Circuit (SLIC), Long Loop, Fixed 600O Input & Network Balance Impedance, Internal Ringing, 5V Supply Voltage, Dual-in-line (DIL) Non-Stocked Lead-Time 18 Weeks
Min.: 1,000
Mult.: 1,000


Silvertel Interface Development Tools Subscriber Line Interface Circuit (SLIC), Long Loop, Programmable Input & Network Balance Impedance, Internal Ringing, 3.3V Supply Voltage, Single-in-line (SIL) Non-Stocked Lead-Time 18 Weeks
Min.: 3,000
Mult.: 60
Lantronix Interface Development Tools NETWORK INTERFACE CARD, 100Base-FX, PCle, MT MM, 2KM, STD/LOW PROFILE, PXE Non-Stocked Lead-Time 20 Weeks
Min.: 1
Mult.: 1
Eaton Interface Development Tools PCE-1G-02-NIC Non-Stocked
A tariff of 38% may be applied if shipping to the United States.
Min.: 1
Mult.: 1

Microchip Technology Power Management IC Development Tools PoE Card with PD77718 PD77010 Non-Stocked
Min.: 1
Mult.: 1
Microchip Technology Power Management IC Development Tools PSE bt with PD77718+PD77010 Non-Stocked
Min.: 1
Mult.: 1
Analog Devices Power Management IC Development Tools LTC1436CGN-PLL - DUAL OUTPUT REGULATOR, Non-Stocked Lead-Time 43 Weeks
Min.: 1
Mult.: 1

Broadcom / Avago Interface Development Tools 9520-8i, Kit, 00, GA Non-Stocked Lead-Time 26 Weeks
Min.: 10
Mult.: 10

Broadcom / Avago Interface Development Tools 9520-2M2 SINGLE KIT, 00 Non-Stocked Lead-Time 32 Weeks
Min.: 1
Mult.: 1

Broadcom / Avago Interface Development Tools 9524-8i Single Kit, NA, 00, GA Non-Stocked Lead-Time 26 Weeks
Min.: 10
Mult.: 5