Texas Instruments TPS2640EVM eFuse Evaluation Module (EVM) allows reference circuit evaluation of the TPS2640 devices. The Texas Instruments TPS2640 is compact 4.2V to 42V, 2.23A industrial eFuses with integrated back-to-back FETs, programmable under voltage, overvoltage, and reverse-polarity features. It also has overcurrent, in-rush current protection, and output current monitoring features.Features
- 4.2V to 42V input operating voltage range
- 0.2A to 2.23A jumper-programmable current limit
- Reverse polarity protection up to –42V
- Programmable input UVLO
- Selectable overload fault response (auto-retry, latch, and circuit breaker)
- Programmable input overvoltage protection (OVP) cut off
- Programmable VOUT slew rate control
- Load current monitor output with 1.5V/A
- Optional onboard transient protection devices like input TVS and output Schottky diodes
- Onboard reset switch and fault indicators
Required Equipment
- Power Supplies
- One adjustable power supply: 0V to 42V output, 0A to 3A output current limit
- Meters
- One DMM minimum needed and may require more if simultaneous measurements are required
- Oscilloscope
- A DPO2024, or equivalent with three 10x voltage probes and one DC current probe
- Loads
- One resistive load which can tolerate up to 3A DC load at 24V
Applications
- HMI power protection in factory automation
- Fire safety systems
- Electronic thermostats and video doorbells
- Industrial PCs
Test Setup